Green lending needs building-level truth.
Current and potential EPC, heating, fuel and cost estimates for covered addresses, with field-level gaps stated - the data layer under green tranches and disclosure work.
Current, potential, and the delta between.
Every address carries its current rating and its potential rating - the gap is the retrofit opportunity, and the field product design teams price green tranches against. The delta is the number, not the letter on its own.
Running costs, for affordability context.
Monthly energy cost estimates describe the property, never the borrower. This is the cost of running the building - a property attribute for affordability context, not a profile of who lives in it.
Product and disclosure support.
Retrofit incentives, green tranches and disclosure work all need building-level truth rather than a postcode average. The heating, fuel and rating fields land in the same call as the valuation.
Dictionary: July 2026
Coverage, honestly.
Profile the book's energy position.
Review current and potential ratings, heating, fuel and cost estimates in a controlled sample, with the coverage stated per field.