PRETIRA
← Collateral data catalogueBills

Current energy rating (declared and predicted) in lending decisions.

Current energy rating (declared and predicted) gives the current EPC rating, declared from the register where present and modelled where absent, published modelled with 97.46% coverage across England and 57.46% across Northern Ireland. Where modelled, it remains separate from declared evidence so you can validate it against your own reference records. Attribution and refresh period are in the dictionary.

Core tierModelledEngland 97.46%N. Ireland 57.46%Refresh Quarterly

Pretira publishes current energy rating (declared and predicted) modelled at 97.46% coverage across England, 57.46% across Northern Ireland, refreshed quarterly, with declared and modelled kept separate.

// routing pattern
IF current_energy_rating_declared_and_predicted < "C" -> route to retrofit product

The sample record returns a current D; on a green proposition that band is the trigger for a retrofit conversation, with the potential rating showing the headroom.

01

Green-lending product routing and disclosure work.

02

Portfolio concentration by energy band.

03

Affordability context via running costs, never borrower profiling.

Declared from the EPC register where a certificate exists; modelled and flagged where absent. Refresh is quarterly, rendered from the dictionary.

Class: Modelled · Refresh: Quarterly · England: 97.46% · N. Ireland: 57.46%

›GET /property/999000000001sandbox: true
property.energy.current_energy_rating_declared_and_predicted"D"
property.energy.potential_energy_rating_declared_and_predicted"B"
property.energy.monthly_energy_cost131
Sample record only - 1 Cedar Street, CH1 1MN. Deterministic synthetic data. No live call from this page.

Three questions on this field.

The register where a certificate exists; a modelled and clearly flagged estimate where none does, so a rule always knows which it is acting on.

Yes - product routing and portfolio segmentation both run on the band. Keep it out of anything touching borrower eligibility.

Covered, with the register partial in Northern Ireland; the coverage column states the figure rather than assuming parity.

Core tier. Routing rules on this page are illustrative patterns; coverage figures render from the dictionary. Dictionary: July 2026.

Review this field before you deploy it.

Start with a synthetic record or a controlled standard sample. We will show the field provenance, coverage and testing, then scope the production route.

Request a controlled sampleSee commercial routes